Stages involved in the digging of an artesian well
Obtain the relevant information from the municipality
- Learn the standards for the installation of an artesian well
- Ask which types of sanitary installations are available in your area (sewers or disposal field)
Carry out a percolation test
- Contact a company that specializes in percolation tests (if a septic installation is required)
- Find the best place to put your septic installation (disposal field, septic tank, etc.)
Contact one of our representatives
- Our representative will carefully evaluate your needs
- He will explain the process of digging an artesian well and the installation of a pumping system
- He will arrange a meeting with you to discuss the different solutions that are available
- He will prepare a detailed submission of a likely scenario for the works
- He will explain how to obtain a permit for your artesian well
Site meeting with the project manager
- The project manager will meet you at the site where the works are to be carried out and explain how to arrange access to the drilling site, the suggested methods of bringing the water into the building, and the space required for installation of the pressure tank
- He will ensure the availability of equipment to enable you to draw up a realistic and relevant schedule
Carrying out the works
- Drilling the well
- Installing the pumping system
- Disinfecting the well
After-sales service
- Your project manager will explain the regulations regarding the analysis of your drinking water