Specialized Drilling - Havre des Cantons

Forage en Estrie pour des murs berlinoisForage spécialisé en EstrieMurs Berlinois

Description

Bernier Wells was commissioned to drill and underpin a retaining wall.  The wall was built to retain the lateral thrust of loose ground around a building.  The temporary structure was used during work on the foundations around the building.

Date

2012

Localisation

Estrie (Magog)

Protect type

Specialized Drilling

Sector

Industrial and Commercial