{"id":396,"date":"2013-12-03T13:53:02","date_gmt":"2013-12-03T18:53:02","guid":{"rendered":"http:\/\/puitsbernier.lotus\/?page_id=396"},"modified":"2014-04-23T15:05:24","modified_gmt":"2014-04-23T15:05:24","slug":"stages-installation-geothermal-system","status":"publish","type":"page","link":"http:\/\/www.puitsbernier.ca\/en\/geothermal\/stages-installation-geothermal-system\/","title":{"rendered":"Stages involved in the installation of a geothermal system"},"content":{"rendered":"<h2>Contact one of our representatives<\/h2>\n<ul>\n<li>The representative will explain to you in detail the preliminary stages in the installation of a <a title=\"Geothermal energy\" href=\"http:\/\/www.puitsbernier.ca\/en\/geothermal\/\">geothermal<\/a> system in your building<\/li>\n<li>He will ask you the right questions in order to design an efficient system<\/li>\n<li>He will put you in touch with the right people to install a heat pump<\/li>\n<\/ul>\n<h2>Determine the output of the system<\/h2>\n<ul>\n<li>It is necessary to work out the precise load by calculating the number of cubic feet to be heated and air-conditioned, the insulation, number of windows, and which way the house faces in relation to the sun and the points of the compass<\/li>\n<li>Contact a geothermal system design or installation company<\/li>\n<\/ul>\n<h2>Site meeting with the project manager<\/h2>\n<ul>\n<li>The project manager will meet you on site where the work is to be carried out and explain how to arrange access to the drilling site, the suggested methods for bringing the pipework into the building<\/li>\n<li>He will prepare a detailed submission in accordance with your requirements<\/li>\n<li>He will collect relevant information on the progress of the work and help you to get the work done at the right time to fit in with your schedule<\/li>\n<\/ul>\n<h2>Installing an external heat exchanger<\/h2>\n<ul>\n<li><a title=\"Artesian wells\" href=\"http:\/\/www.puitsbernier.ca\/en\/arterian-wells\/\">Drill<\/a> the borehole(s)<\/li>\n<li>Engineer the borehole(s)<\/li>\n<li>Install the tubing for horizontal distribution<\/li>\n<\/ul>\n<h2>Installing an internal heat exchanger<\/h2>\n<ul>\n<li>Installation of your heat pump and equipment inside the building by a specialist company<\/li>\n<li><span style=\"line-height: 1.5em;\">Starting the system<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Contact one of our representatives The representative will explain to you in detail the preliminary stages in the installation of a geothermal system in your building He will ask you the right questions in order to design an efficient system He will put you in touch with the right people to install a heat pump [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":8,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-396","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/comments?post=396"}],"version-history":[{"count":10,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/396\/revisions"}],"predecessor-version":[{"id":697,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/396\/revisions\/697"}],"up":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/8"}],"wp:attachment":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/media?parent=396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}