{"id":1246,"date":"2018-08-09T17:26:54","date_gmt":"2018-08-09T17:26:54","guid":{"rendered":"http:\/\/www.puitsbernier.ca\/en\/?page_id=1246"},"modified":"2026-07-15T13:46:40","modified_gmt":"2026-07-15T13:46:40","slug":"filling-an-artesian-well","status":"publish","type":"page","link":"http:\/\/www.puitsbernier.ca\/en\/arterian-wells\/filling-an-artesian-well\/","title":{"rendered":"Filling an artesian well"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In Qu\u00e9bec, every artesian well owner is responsible for maintaining their water supply system. The Regulation respecting the withdrawal and protection of groundwater (RPEP) was established to protect groundwater resources by reducing the risk of contamination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When an artesian well in Qu\u00e9bec is no longer in use, it cannot simply be abandoned. Property owners are required to have the well properly sealed, a permanent procedure that eliminates potential contamination pathways and ensures compliance with provincial regulations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why Seal an Artesian Well?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An abandoned artesian well can become a direct pathway for contaminants to reach groundwater, putting drinking water quality at risk. Properly sealing an unused well helps protect the environment, preserves groundwater resources, and ensures compliance with Qu\u00e9bec&#8217;s environmental standards.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The Artesian Well Sealing Process<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The sealing of an artesian well must be carried out by qualified professionals in accordance with the requirements of the RPEP. The process generally includes the following steps:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Excavate the well casing to a depth of approximately one metre below ground level.<\/li>\n\n\n\n<li>Cut the steel casing at the bottom of the excavation.<\/li>\n\n\n\n<li>Fill the portion of the borehole that is in contact with the geological formation using clean sand.<\/li>\n\n\n\n<li>Fill the remaining section of the steel casing with bentonite or a cement-bentonite mixture.<\/li>\n\n\n\n<li>Use only materials that will not adversely affect groundwater quality.<\/li>\n\n\n\n<li>Install a concrete cap over the top of the remaining steel casing.<\/li>\n\n\n\n<li>Backfill the excavation using the original excavated material.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Following these procedures ensures that the artesian well is permanently sealed in a safe, environmentally responsible manner while protecting groundwater resources for future generations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Trust Qu\u00e9bec&#8217;s Artesian Well Experts<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For more than 75 years, Puits Bernier has been providing professional artesian well services throughout Qu\u00e9bec. Whether you have questions about artesian well sealing, artesian well drilling, well maintenance, or Qu\u00e9bec regulations, our experienced team is here to help.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Have questions about your artesian well? <a href=\"https:\/\/www.puitsbernier.ca\/en\/contact-us\/\" type=\"page\" id=\"12\">Contact us today.<\/a> We will be happy to provide expert advice and recommend the solution best suited to your needs.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"377\" src=\"https:\/\/www.puitsbernier.ca\/en\/wp-content\/uploads\/sites\/2\/2026\/07\/obturation-puits-artesien-1200x377.jpg\" alt=\"\" class=\"wp-image-1408\" srcset=\"http:\/\/www.puitsbernier.ca\/en\/wp-content\/uploads\/sites\/2\/2026\/07\/obturation-puits-artesien-1200x377.jpg 1200w, http:\/\/www.puitsbernier.ca\/en\/wp-content\/uploads\/sites\/2\/2026\/07\/obturation-puits-artesien-768x241.jpg 768w, http:\/\/www.puitsbernier.ca\/en\/wp-content\/uploads\/sites\/2\/2026\/07\/obturation-puits-artesien.jpg 1500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In Qu\u00e9bec, every artesian well owner is responsible for maintaining their water supply system. The Regulation respecting the withdrawal and protection of groundwater (RPEP) was established to protect groundwater resources by reducing the risk of contamination. When an artesian well in Qu\u00e9bec is no longer in use, it cannot simply be abandoned. Property owners are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":6,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1246","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/1246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/comments?post=1246"}],"version-history":[{"count":4,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/1246\/revisions"}],"predecessor-version":[{"id":1409,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/1246\/revisions\/1409"}],"up":[{"embeddable":true,"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/pages\/6"}],"wp:attachment":[{"href":"http:\/\/www.puitsbernier.ca\/en\/wp-json\/wp\/v2\/media?parent=1246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}